Challenges/City of Oakland Civic Lab Verified Org

Oakland Storm-Drain Solar Acoustic Sensor Spark

Community request & initial power budget for an ultra-low-power storm-drain ultrasonic water level node.

Immutable Judging Rubric

SHA-256 Locked

Hash: 2560fc81baa5198a21018b92908e1e850d5d8960aa0c4eb9214e7a08ee22e8e1

IP67 Salt-Spray & Culvert Debris Sealing40 pts

Demonstrates 72h simulated splash survival without ultrasonic drift.

LoRaWAN Payload & Solar Power Budget35 pts

Verified < 180 uA deep sleep and >= 14 days autonomy without sun.

Public BOM Availability & Sub-$95 Unit Cost25 pts

Reproducible parts list using COTS enclosures and non-ITG connectors.

Sponsor Milestones & Escrow

Milestone 1: Bench Hydrostatic & LoRa Link Proof
pending$5,000

Upload IP67 splash soak log and RSSI link test.

Milestone 2: Field Culvert Pilot Delivery (5 Units)
pending$10,000

Open BOM, CAD, and 14-day Oakland storm-drain telemetry.